Immosearch Immosearch
Sign up

Cancel
KI-Symbolbild: Aufgeräumte kleine Werkstatt mit Werkbänken und Holzplatten, durch das große Fenster ist ein Baugerüst am Nachbargebäude zu sehen.
Practical article Commercial & leases Austria

Refurbishment in the neighbouring part of the commercial building: Redefining your operation for the construction phase

Relate a announced construction site next to commercial premises to the specific affected activities and prepare a robust substitute operation.

Automatically translated – the German version is legally binding. Show original (German)

Published
19 Oct 2026
Applies to
Austria
For whom
Agents & providers
Article ID
WX26-P11-0004

The refurbishment affects another unit; your rooms remain unchanged on the plan. Nevertheless, your operation may depend on blocked accesses, scheduled shutdowns or altered delivery routes. The organisational question is therefore: which services can you actually provide during which construction phase? This article deals with preparing that operational picture, not with claims against landlords or construction companies.

Turn the construction schedule into an operational calendar

Request the available timetable with the reference date. Mark announced closures, interruptions and not-yet-confirmed time windows. Enter your own activities beside them. A locked rear entrance, for example, affects goods receipt, waste disposal and the routes of individual service providers; customer appointments can at the same time run via another entrance.

Do not note simply “operation affected”. Describe the respective process so concretely that an alternative can be considered. Confidential consultations may need another room; storage work may need a different delivery time. Whether a proposed substitute room is professionally suitable remains a separate assessment.

Separate secured information from reassuring expectation

In a hypothetical case a technical shutdown is announced for a Monday. In conversation it is said it will probably be completed before business opening. That is not yet a confirmed starting condition for the planned morning. The business determines which of its activities cannot be offered without that service, and decides on a pre-agreed substitute window.

The information is given a responsible contact point and a date for the next update. A single promised feedback must not appear as a guarantee for the entire construction schedule. If a decisive answer remains outstanding, the affected process remains open.

Plan a substitute operation with its own capacity

An alternative room does not automatically offer the same service as the previous location. What equipment is available there? How many appointments actually fit in? Can required items be moved without interrupting other activities? For each substitute, scope and duration are expressly described.

Also plan the return. Between the end of a construction work and the renewed own use there may be cleaning, technical confirmation or the return delivery of equipment. Which prerequisites are necessary is determined by the responsible specialists. A photo of the tidied corridor does not replace this clarification.

Derive communication from the confirmed scope

Customers need the information that concerns their specific appointment: reachable entrance, confirmed location, possible change and a reliable contact. Internal speculations about the cause of delays rarely help them. Suppliers may need a different notice than visitors.

At the end there is a small decision for each activity: possible as usual, possible with a confirmed adjustment or provisionally suspended. Document the underlying plan status. Legal questions about tolerance (Duldung), rent, damage or compensation are examined separately with the actual documents. The organisational preparation does not pre-empt any of these questions.

Sources and context

Quellenfreie eigene redaktionelle Methode, keine Behauptung aktueller Rechtsregeln, Marktpreise oder technischer Grenzwerte. Alle Fallbeispiele und Rechenannahmen sind eigens entwickelt und fiktiv.

Created with the help of AI and editorially reviewed. General guidance only; not individual legal, tax or financial advice. Errors and later changes are possible.