Immosearch Immosearch
Sign up

Cancel
KI-Symbolbild: Ein Fenster mit einem Rollladenkasten darüber in einer Wand, darunter liegt Werkzeug auf einem Abdecktuch.
Practical article Renovation & energy Germany

The old roller shutter box remains during the window renovation: Clarify its energy-related role separately

Consider existing integrated roller shutter boxes in window or façade renovations as a separate existing-condition, variant and connection task in the contract.

Automatically translated – the German version is legally binding. Show original (German)

Published
19 Oct 2026
Research as of
17 Oct 2026
Applies to
Germany
For whom
Owners & landlords
Article ID
WX26-P08-0081

The old windows are being replaced and the roller shutter box integrated into the wall is to remain. The offer says a lot about the new glazing, but about the box only “Bestand”. That does not yet describe how this part will be incorporated into the energy-related renovation. Include it in the planning as a separate existing-condition and connection issue before commissioning.

Recognise the box as a building component

The dena guide describes existing roller shutter boxes as a possible thermal weak point and names strap openings as possible leaks. For the renovation it considers different approaches between retention, removal and different arrangements. [KASTEN] The article does not declare any of these approaches the best solution for every building and does not contain any insulation or sealing instructions.

Our editorial recommendation: Have the actual existing construction identified. Are there documents and which parts have already been altered? A uniform appearance of several windows does not automatically confirm the same box construction everywhere. Missing information should be professionally clarified before a uniform execution commitment.

Formulate the desired retention precisely

Consider which function you want to continue to use and what about it is alterable. “Keep the roller shutter” can mean that the shading is desired; that does not yet decide on all the old components. Have the specialist planning explain which suitable variants should be examined for this specific situation.

If windows and façade are worked on at different times, the intended connections and interim conditions must be coordinated. A component must not disappear between contracts merely because it initially belongs to the existing condition for both companies. Ask who will describe the technical overall solution for this connection.

Find the service clearly in the offer

Ask for a concrete explanation of the included box and its connection area. What will be inspected, what will be worked on and which unresolved prerequisite must be clarified before execution? Later operation and required accessibility should also be explained for the proposed system.

The professionally chosen procedure is not to be replaced by householders’ improvised stuffing or sealing. Movable components, unknown installations and the actual construction may otherwise be disregarded. A suitable solution needs the specific existing condition.

Hypothetical case: The new window alone is not yet a complete order

An owner initially compares only the new windows. When checking the scope he recognises that no work is described for the old boxes. He has the specialist planning supplement this area and then has the offer refer to it. He only decides on retention or alteration after the explained variant assessment.

Keep the final solution together with the window and façade planning. That way it remains traceable which existing parts were deliberately included. The article promises no specific energy savings and no exemption from permits; it closes a concrete gap in the renovation scope.

Sources and context

Created with the help of AI and editorially reviewed. General guidance only; not individual legal, tax or financial advice. Errors and later changes are possible.