The insurer asks about an incident: Create a neutral chronology without promising cover

How do I collect the actual sequence of events for the responsible claims handler?

Automatically translated – the German version is legally binding. Show original (German)

Published
19 Oct 2026
Applies to
Austria and Germany
For whom
Owners & landlords
Article ID
WX26-P09-0031

After an incident, the insurer or the responsible claims handler asks about the sequence of events. Various accounts are already circulating in the building. For a usable chronology, times, observations and later conjectures should be kept separate. The article does not assess insurance cover, reporting deadlines or claims.

Start with what is actually known

Note the known start of the perception, not automatically the start of the incident. If the exact time is unclear, give a comprehensible period. The source and date of a statement belong to this.

Secure existing documents only by appropriate authorised channels. Photographs should show the relevant condition, not casually distribute private content. In the case of current hazards, follow the suitable emergency route before completing a chronology.

Keep incident and handling separate

The first thread should record what was perceived. A second thread shows reports, specialist contacts and measures with their actual confirmations. A commissioned investigation is not equivalent to its result.

Ask the responsible claims handler specifically which information is required for the case in question. This prevents the entire building archive being sent with unnecessary individual case data. Required statements and time‑bound steps must be clarified individually.

Hypothetical case: Two times mean different things

A resident noticed the condition in the morning. A service provider gives the time of their later arrival. In an initial summary this was turned into a single presumed incident start. The administration corrects the chronology and records both times with their meanings.

The technical cause remains open. The more precise timing is not described as proof of cover or attribution of fault.

Continue working with the open questions

Mark which question can only be answered by a specialist and which document is still expected. Subsequent statements receive their actual receipt date. The original perception is not retroactively rephrased to fit.

A good chronology is neutral enough to allow for another explanation. It helps the responsible claims handler to assess the actual course of events without turning the administration into a loss adjuster.