Immosearch Immosearch
Sign up

Cancel
KI-Symbolbild: Eine Edelstahlspüle mit neuer Chromarmatur in einer Mietwohnung, daneben etwas Werkzeug, im Flur klein ein Handwerker.
Practical article Renting & everyday living Germany

The repair company sends you an invoice: first clarify who commissioned the work

Invoice address, contract for work and tenancy cost-bearing are different questions. Check the actual sequence and possible additional orders before deciding on payment.

Automatically translated – the German version is legally binding. Show original (German)

Published
19 Oct 2026
Research as of
17 Oct 2026
Applies to
Germany
For whom
Searchers & tenants
Article ID
WX26-P02-0130

Reader question: Am I, after a repair visit organised by the property management, the client (Besteller) of the work solely because the invoice was addressed to me?

The property management organised a repair appointment in your German flat. You let the tradesperson in and later received an invoice in your name. Before deriving your own payment obligation from that, three things must be separated: the contract for work (Werkauftrag), the invoice address and a possible cost-bearing obligation under the tenancy.

Reconstruct the sequence up to the commissioning

Collect the defect report, appointment confirmation, order documents and any messages from the management. Who ordered which work from which company? Did you only coordinate access yourself or additionally request a specific service? Record which details are reliably documented and which are only recollected.

A signature on a visit report is examined based on its actual wording. A confirmation of presence, a declaration of acceptance and a new chargeable order are not simply interchangeable terms. Keep the complete signed version.

Determine the direct contractual claim under the contract for work

§ 631 BGB allocates the agreed remuneration to the client (Besteller) of the work. [BGB631] An invoice printed in your name therefore does not alone answer whether you actually hold that contractual position. Ask the company for the concrete basis of their claim and the corresponding order.

When acting for others, representation also matters. § 164 BGB concerns declarations made in the name of the person represented within existing authority to represent. [BGB164] Have it checked, therefore, for whom an involved person clearly acted. An assumed authority and an actually existing power of representation are not equated.

Consider your own additional requests separately

Perhaps the company fixed the originally commissioned defect and you additionally ordered a private job. In that case different performance and contractual bases may be in play. Note when an additional request was expressed, which price was discussed and which item the invoice contains for it.

In the hypothetical case the main repair was demonstrably ordered by the management. The tenant also asked on site for a private installation independent of that. They have both parts assigned separately. The example confirms neither a specific claim nor a valid additional order.

Examine the tenancy-related cost question separately

§ 535 BGB regulates, among other things, the landlord’s duty to maintain. [BGB535] Whether, in addition, an effective cost clause or a claim for damages exists in an individual case is a different question than the direct contractual claim of the company.

If such a basis is asserted, have it checked against the actual defect and the complete contract. The article does not assess any single small-repair clause and does not automatically allocate costs to any party. An unresolved order is not replaced by a blanket statement “tenant pays repairs”.

Respond with a specific query rather than mere non-payment

Name the invoice number and the exact point in dispute. Share the available order documents and note any payment or court letters received. If the matter is contentious, the complete package belongs to the consultation in good time.

The process ends with a comprehensible assignment or a concretely remaining question in dispute. A corrected invoice, a professional performance examination and a confirmed cost-bearing are each separate outcomes.

Sources and context

  • [BGB631] BGB § 631 — Bundesministerium der Justiz und für Verbraucherschutz / Bundesamt für Justiz. Geltung: Deutschland. Abruf am 17.10.2026.
  • [BGB164] BGB § 164 — Bundesministerium der Justiz und für Verbraucherschutz / Bundesamt für Justiz. Geltung: Deutschland. Abruf am 17.10.2026.
  • [BGB535] BGB § 535 — Bundesministerium der Justiz und für Verbraucherschutz / Bundesamt für Justiz. Geltung: Deutschland. Abruf am 17.10.2026.

Created with the help of AI and editorially reviewed. General guidance only; not individual legal, tax or financial advice. Errors and later changes are possible.