Staying at home during a renovation: plan construction stages and everyday living together

Before living through a renovation, clarify which everyday functions will actually remain in each construction stage and when alternative accommodation must be organised.

Automatically translated – the German version is legally binding. Show original (German)

Published
19 Oct 2026
Applies to
Austria and Germany
For whom
Owners & landlords
Article ID
WX26-08-AT-011

A renovation has been decided, but you want to stay in the flat during the work. The crucial plan is then not just a list of construction measures. You need a clear idea of how living and working should coexist in each phase. The following recommendations organise this coordination; they do not assess the health-related or technical suitability of staying.

Walk a typical day through the construction schedule

Start with the functions your household actually needs: sleeping, cooking, using a toilet and washing facilities, working, caring for children or receiving necessary personal assistance. Note special needs without exposing them unnecessarily in a generally distributed list of construction tasks.

Alongside that, set out the planned construction stages. For each stage clarify which rooms and routes will actually remain usable and what will be temporarily out of service. Ask the responsible specialists explicitly about restrictions and suitable protective or partitioning measures. An unoccupied room is not automatically a suitable spare living area simply because no one is working there at the moment.

Get statements about the schedule confirmed concretely

“It will somehow work” is not a usable basis. Ask about the expected work area, the planned interruptions and the contact person who will be reachable at each stage. Record which details are firmly agreed and which are still provisional assumptions about the schedule.

Agree a procedure for changes. If a stage must be moved or extended, someone should review the impact on the living plan. A message to a single tradesperson does not replace a coordinated decision by all parties involved. Let technical questions be answered by the responsible specialists, rather than deriving your own dust, drying or safety limits from internet examples.

The contingency solution must come before the bottleneck

Describe at which actually confirmed condition staying is no longer sensible or, according to expert assessment, would not be suitable. Then arrange in good time for an available alternative for your household. A non-binding promise of a place to sleep with friends is a different matter from accommodation confirmed for the period required.

Don’t compare only the overnight stay. Commuting, childcare, pets, personal assistance and required items must work in the same phase. The financial and contractual consequences of alternative accommodation remain a separate matter for review; the living plan does not promise any entitlement to reimbursement.

One construction stage, two different weeks

In the hypothetical example a family wants to stay during the renovation. For the first week, after coordination a usable living area is planned. For the following phase it is, however, still unclear how necessary access and washing facilities will work.

The family does not treat the successful first week as proof for the whole project. They have the second stage explained and reserve a genuinely suitable alternative where the still-open prerequisites require this. At the same time the personal items needed for this change are packed separately so that the entire household does not have to move.

A short daily coordination instead of constant improvisation

Designate a manageable handover point for the next planned work: what will be needed, which access is intended and which queries remain open? Changes to the working area are discussed with the responsible persons. Your own rearrangements should not alter agreed procedures unnoticed.

At the end of a stage it is clarified whether and under which conditions the area can be used again as planned. An organisational confirmation is not a technical release. The benefit of this living plan is that decisions about staying, moving out and returning are not made only under the pressure of an everyday function that has already failed.

Sources and context

Dieser Beitrag beschreibt einen eigenen organisatorischen Ablauf. Länderspezifische Rechtsregeln, technische Grenzwerte oder aktuelle Förderbedingungen werden damit nicht vorgegeben.

Die allgemeinen Vorgehensweisen und Beispiele sind eigene redaktionelle Empfehlungen. Die Beispiele sind fiktiv.

Created with the help of AI and editorially reviewed. General guidance only; not individual legal, tax or financial advice. Errors and later changes are possible.