Immosearch Immosearch
Sign up

Cancel
KI-Symbolbild: Leere Altbauwohnung zwischen zwei Vermietungen mit Malerleiter am Fenster, neuer Deckenleuchte und einem Pflanzkasten.
Practical article Letting Austria and Germany

Between two tenancies: Organise the vacancy as a small operational project

Plan the vacancy between two tenancies as its own operational phase. Condition, access, necessary technical coordination and the next letting are brought together.

Automatically translated – the German version is legally binding. Show original (German)

Published
19 Oct 2026
Research as of
17 Oct 2026
Applies to
Austria and Germany
For whom
Everyone
Article ID
WX26-03-AT-007

The previous tenant has moved out, the next has not yet moved in. In this phase the flat is not simply a dormant listing. Access, ongoing supervision, any works and the later handover require a coordinated context. This article offers organisational recommendations for Austria and Germany; it is not a technical operating instruction and does not determine any tenancy or insurance law obligations.

Establish a clear starting point

Start with the actually documented condition of the returned flat. Separate existing observations, unresolved condition issues and positions that have not yet been finally clarified. An empty flat is not automatically free of defects; conversely, a noted irregularity is not yet a confirmed cause or claim for costs.

Determine which person will keep the ongoing overview. They should be able to identify who has access, which appointments take place and which work is planned next. This organisational role does not replace the technical authority to commission any technical measure or to make legal declarations.

Clarify an actual supervision plan for the vacancy

Ask the responsible specialist departments or caretakers about the procedures suitable for the specific building and phase. Heating, water or other installations are not switched off or altered arbitrarily merely for a general idea of saving. The appropriate mode of operation is clarified on the basis of the building and the intended duration.

The German Umweltbundesamt explains that the operation of a drinking water installation also affects water quality and that little-used pipe sections can be problematic. [UBA] An Austrian AGES special action also investigates the possible influence of pipes, fittings and stagnation. [AGES] These fundamentals justify the technical enquiry; they do not provide a universal flushing duration or the clearance of a specific water system here.

Bring access and works into the same sequence

Record planned viewings, specialist appointments and your own organisational visits. Several service providers should not independently treat the same flat as an available workspace. Clarify who provides access and how the result will be reported back.

Preparation, execution and confirmed result remain separate stages. An agreed appointment is not completed work. Even the message “finished” is, for a significant item, linked to the intended feedback or technical documentation.

Example: Decorating appointment and building services overlap

In a hypothetical sequence, surface works are planned. At the same time it is still unclear who will take over the coordinated supervision of the existing installations during the vacant period. The owner compiles both issues in an overview: access for the works, responsible technical enquiry and the subsequent documented status.

They do not automatically treat the person who merely hands over the key as the technical supervisor. Likewise, they do not plan the later handover solely on the basis of the end of the decorating appointment if another substantial issue is still unresolved.

Do not confuse the planned tenancy start with the desire to carry out works

For the further letting you need a factual position on what will probably be ready by when. Unconfirmed delivery or execution dates should not be advertised as guaranteed completion. If a delay becomes foreseeable, the appropriate organisational and, where necessary, legal clarification must take place in good time.

Also note which documents or instructions should be available for the next occupancy. The new tenant should not have to guess from contradictory scraps of paper which operating method or responsibility now applies.

Consciously conclude the vacancy

Before the intended handover compare the current status with the open points from the start. What has actually been completed, what remains to be clarified and which information must be passed on to the next responsible person? Technical results are adopted as such and are not replaced by a general personal impression.

This conclusion is more than a new calendar appointment. It links the documented initial condition, the steps taken during the vacant period and the information required for further use. In this way the time between two tenancies remains a comprehensible phase with clear tasks rather than an organisational gap.

Sources and context

Created with the help of AI and editorially reviewed. General guidance only; not individual legal, tax or financial advice. Errors and later changes are possible.